Artis zee
Floor-mounted system for surgical angiography
Remote Service*
Preparation for Siemens Remote Service (SRS):
Allowed hardware and software remote diagnosis
Allowed remote system configuration, e.g., adding a DICOM node
Early warning system to help ensure system operation (Guardian)
Emergency power supply*
Emergency power supply* for the imaging system
Bridging of the imaging system power supply (50/60 Hz) until line voltage is back. In case of power failures of more than
90 seconds the imaging system will be shut down automatically.
Nominal power 2 kVA
Emergency power supply* for all system, table movements and imaging system
Emergency power supply for uninterrupted power supply for all system and table movements, as well as imaging system
and monitors for a period of at least 10 min. during a primary power failure.
Nominal power 15 kVA
Line voltage 400 V for 440 V or 480 V; an adaptation to 440/480 V is required.
Emergency power supply* for the entire system incl. emergency fluoro
Emergency power supply for the entire system incl. emergency fluoro for a period of at least 10 minutes during a primary
power failure. Uninterrupted power supply for all system and table movements, as well as imaging system and monitors.
Approx. 65 seconds after switching on and restarting the generator, you will be able to work with continuous fluoroscopy
in emergency operation mode.
Nominal power 40 kVA
Line voltage 400 V for 440 V or 480 V; an adaptation to 440/480 V is required.
Installation data
Line voltage connection, 3-phase /
Generator
Nominal voltage
1
(3 ph ± 10%) 380, 400, 420, 440, 480 V at 50/60 Hz ± 1 Hz
Fuse internal 50 A, external depending on Fl type
Power consumption 8 kVA for fluoro; 160 kVA for acquisition
System control cabinet
Nominal voltage
1
380, 400 and 440 V at 50/60 Hz ± 1 Hz;
(3 ph ± 10%) 480 V at 60 Hz ± 1 Hz
Fuse internal 35 A, external 50 A slow-blow fuse
Power consumption max. 8.5 kVA
1
Max. allowable nominal voltage between phases (L1, L2, L3) and PE 300 V